Ok so i've finished up my 4x10 table for my layout, bad part is due to and injury i got in iraq my hand is not as steady as it use to be. My table goes into a point in the middle. ( i just ran a 45"x36" oval test in the center of the layout and no derail but that was with a GP9M and 4 cars) Its not that bad but i feel it might be enough to derail a train or two when the loads get longer. Also as a side note the wood i got was free at the local landfill. For me to get good lumber i have to drive to Barstow. Also i dont think two 4x8's is going to fit in a Honda Civic. I wish i could get pics posted but im still working on that. (for some reason my pics always come out around 1.2MB)
The plan is to use EZ-Track by Bachmann with mainly BNSF/SF loco's. Im still in debait about going DCC or not. The reason is ill only have 2 or 3 loco's to run. Im crossing my fingers on this one so i will work.
One more thing anyone out there using Ez-Track by bachmann? What do you use to mount the track to the table?
http://www.modelrailroadphotos.com/photos/showphoto.php?photo=2418&limit=recent
I hope the link works
The plan is to use EZ-Track by Bachmann with mainly BNSF/SF loco's. Im still in debait about going DCC or not. The reason is ill only have 2 or 3 loco's to run. Im crossing my fingers on this one so i will work.
One more thing anyone out there using Ez-Track by bachmann? What do you use to mount the track to the table?
http://www.modelrailroadphotos.com/photos/showphoto.php?photo=2418&limit=recent
I hope the link works
Last edited by a moderator: