Mountain, tunnel & stream progress

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


NYC_George

Well-Known Member
Last week I decided to try and finish the mountain, tunnel and stream I’ve been planning for about 5 years. The mountain and tunnel will eventually cover the entire turn over tracks 1 & 2. Here are some photos of the progress I’ve made.

NYC_George
 
Lots of good work there, nice quality. Do you mean that the culvert will be covered as well, or have I misunderstood you?

-Crandell
 
No Selector the culvert area is open and gets some steep rocks down to the stream. Later I’ll add some small trees around it. There’s a real stream not far from here with the same type setup. The stream will also have a water fall by the farm where it falls into the basin the railroad built. I haven’t figure that out yet, waterfalls are hard to model. The whole area was resigned about 5 years ago and never finished. I don’t think I’m going back to work so I’ll have lots of time to get things done this time.

NYC_George
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top