Last night was a work night on the Souris Valley Railroad. When I get to the layout I always walk around the layout to see what has been done since my last visit/work session. When I walked into the second room I notice right away that more work had been done on the main line. As I looked further I noticed that the main line has now been completed. When the track guru showed up he immediately started connecting the feeder wires to the bus to get it up and running.
We are planning on having our second club open house sometime in December complete with a mainline golden spike ceremony. The mainline is approximately 250 feet (will have to measure) through two rooms.
Now on to the industrial spurs, a small staging yard, and the yard for the maintenance equipment.