Mimeya revisited. Was s-curve in yard throat

ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


ctclibby

Well-Known Member
Hi All

Thanks to all of those commented on my original plan. I have managed to set my minimum radius to 30" and have more found more floor space. I still have a peninsula that is a mountianous area that traverses between the levels but it looks to be easier for operators to follow their trains. The helix also got a little bigger. I moved Fardel Yard to make room for steam and diesel facilities on either end. Fardel now has a 90 degree curve in ( almost ) the middle and curved switches in the ladder tracks to keep things shorter. Note that there are still things to be done. I have not done the elevations; Wayfair passenger terminal needs work and the steam and diesel servicing facilities do not have tracks. Also, there are no sidings on the main yet.

Check it out http://www.soundrail.com , click on Projects, then Layout Construction.

Ideas? Comments?

Thanks

ctclibby
 




Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top