Layout Update


rgeiter

Conrail Quality
Well, this is the last area on the mainline/ lower level to be done. Originally I had the Walthers Water Street Freight station here but it was too big. It’s now an orphan structure. So after considering my options, I’ve decided to go with the Walthers gravel company which will be renamed “Rocky Gravel” I’ve already started some of the hills/ embankments around the facility. More to come.
91DEF466-BC64-4C14-90DB-D94B08786E7C.jpeg
8F6267E0-DD89-4BE6-A041-8CF74B158462.jpeg
23DE5417-C55D-4F2A-8DB6-D788EBDD8CA8.jpeg
8019518C-9572-46AC-9137-D775F5EDDC42.jpeg
 
Well, pulled up the tracks, removed the roadbed, put the tracks back down at 2 inch centers and ballasted up to the building. Now I have to figure out how I’m going to configure the conveyors and where to place the rest of the foam I have planned for this area. I also ordered more conveyors because the three that came with this kit isn’t enough. What I thought was a nice big area for this gravel plant just got really small and cramped. I’ll figure something out.
5F031436-7A20-4D06-85A1-FE6C81C86E7B.jpeg
 



Back
Top