RE#1 Well-Known Member Sep 10, 2021 #61 Paint still drying asphalt next then I will spray sidewalks. Had to add some more plaster to the hotel foundation.
Paint still drying asphalt next then I will spray sidewalks. Had to add some more plaster to the hotel foundation.
RE#1 Well-Known Member Sep 11, 2021 #68 Slowly getting there. I love the bus. Still have a lot to go.
RE#1 Well-Known Member Sep 12, 2021 #74 Have to make some steps for the front door to the restaurant and I filled in the small holes on the plaster foundation
Have to make some steps for the front door to the restaurant and I filled in the small holes on the plaster foundation
RE#1 Well-Known Member Sep 14, 2021 #78 So the painting on the hotel will have an artist on a scaffold with bystanders. I will have several buckets of paint.
So the painting on the hotel will have an artist on a scaffold with bystanders. I will have several buckets of paint.
RE#1 Well-Known Member Sep 14, 2021 #80 I am going to put a fence in front of the hotel and one around the back/side of the paint store. Going to finish the roof on the hotel tomorrow and finish the roof details on the other buildings.
I am going to put a fence in front of the hotel and one around the back/side of the paint store. Going to finish the roof on the hotel tomorrow and finish the roof details on the other buildings.