Finally one upper deck yard done.


NYC_George

Well-Known Member
Because it's been so cold lately my company has been unable to pour concrete on the 40th floor. So that has given me almost two weeks off. Even enough time to get one of the upper deck yards done.

udf_yard_1.jpg


udf_yard_2.jpg
 
Are you considering some sort of barrier beyond the little lip? Seems like it might be an un-glorious fall from there.
 
Not Staging

Looking good It's not staging is it ? Hope not looks to good.

No Radar the staging goes over the helix. I just installed the switch to link the staging yard today. It hasn't been built yet. I'd like to get the track work done so I can start on the structures for the upper deck. My wife builds most all the structures and she's bored with winter so I need to get some going.

NYC_George
 
Upper Deck

Are you considering some sort of barrier beyond the little lip? Seems like it might be an un-glorious fall from there.

I'm standing behind my track work Josh. The upper deck is eye level any type of lip would runin the view. The other day went I was videoing at Janesville curve I backed the 25 car train back through the S curve 3 times without a derailment.

NYC_George
 



Back
Top