ringo thomas
New Member
So how much time do you all spend doing the details inside your buildings and trains?
I have been building my ticket office for 3.5 weeks now and i still have a long way to go. Every rubber mould takes me a couple of hours to carve, then i have to pour the figure and paint it.
Also i am having a lotof trouble with the turnstyles and ticket gates.
it is very fiddly business this stuff!
i have kept all my moulds and i may sell them on ebay or direct through thi site at a later stage. Let me know if you are interested.
Over and out.
I have been building my ticket office for 3.5 weeks now and i still have a long way to go. Every rubber mould takes me a couple of hours to carve, then i have to pour the figure and paint it.
Also i am having a lotof trouble with the turnstyles and ticket gates.
it is very fiddly business this stuff!
i have kept all my moulds and i may sell them on ebay or direct through thi site at a later stage. Let me know if you are interested.
Over and out.