rlundy90
Armchair Engineer
Well I've finally collected pretty much everything to build the first part of my Greater Winnipeg Water District Railway. The yard is the first part that will be done. This contains the station and engine house.This part of the layout is 14' x 6'.It will eventually be a point to point railway 45' long with several peninsulas in between.At opposit end is indian bay yard.That will be the next part. Then the sections in between last.I'm looking for sugestions on later making it into a loop for continuous operation so I can have the trains operate on thier own instead of having to swith direction and go back.There are connections to both Cp and CNR from this railway.Will post the track plan for the yard plus some prototype pics in the near future. I hope to start the benchwork in about a month.I have to finish up that side of the basement first.Ron