Here are some shots of the first train to run on my layout depicting the Wabash RR Columbia branch that ran from Centralia to Columbia Mo. My layout is set in the fall of 1963. Some of the track work is still temporary, I'm still making adjustment so the structure will fit. The track layout matches the prototypes at the time I'm modeling.
Train arriving in Columbia.
Our GP has run around the short train and begins switching the local industries.
With the work done for the day the loco ties up.
Short video of train arriving.
http://www.youtube.com/watch?v=DA8miaMR_hw
Train arriving in Columbia.
Our GP has run around the short train and begins switching the local industries.
With the work done for the day the loco ties up.
Short video of train arriving.
http://www.youtube.com/watch?v=DA8miaMR_hw