Motley
Active Member
I just picked up the new release of the CV 150' Truss Bridge. I've built a CV girder bridge before, and it was fairly easy.
This bridge has a lot more parts, and seems kinda complicated. I'm replacing this bridge with my Atlas truss bridge. In the main layout room.
I'm redoing this entire area. With a new bigger river under the bridge, that will go to the edge of layout. I'm ripping out the lower tracks there, and there will be two new lower tracks, that will traverse the river
Old bridge:
Here is the re-designed trackplan for this main layout room. This new bridge is the top track against the wall.
Here is the progress I made so far. I'll keep updating this thread with progress photos.
This bridge has a lot more parts, and seems kinda complicated. I'm replacing this bridge with my Atlas truss bridge. In the main layout room.
I'm redoing this entire area. With a new bigger river under the bridge, that will go to the edge of layout. I'm ripping out the lower tracks there, and there will be two new lower tracks, that will traverse the river
Old bridge:
Here is the re-designed trackplan for this main layout room. This new bridge is the top track against the wall.
Here is the progress I made so far. I'll keep updating this thread with progress photos.