ModelRailroadForums.com is a free Model Railroad Discussion Forum and photo gallery. We cover all scales and sizes of model railroads. Online since 2002, it's one of the oldest and largest model railroad forums on the web. Whether you're a master model railroader or just getting started, you'll find something of interest here.


Michael B

nGuru Train Layouts & Components
Hello everyone.

Did you know that the Arnold factories are operational?
Operating cars dump "coal product" into a bin, the conveyer then lifts & dumps
it into the top of the big building, where it kinda falls through all the
way down into a car waiting on the lower track.
Real operations in N without uncoupling!
They also have a sister "dumping station".

I tried for a month to sell this stuff for $250, no buyers, but lots of lookers.
Pretty rough condition...but hell, there were six cars in there.

Lots of potential - but it looks like it is up to me to realize it.

Here is a pic from the attempted sale...
 

Attachments

  • Factory 0a.jpg
    Factory 0a.jpg
    418.7 KB · Views: 53
Day 1.

Here we have a "before" shot of the factory in question, and one of it disassembled.
 

Attachments

  • Factory 1a.jpg
    Factory 1a.jpg
    728.3 KB · Views: 41
  • Factory 1b.jpg
    Factory 1b.jpg
    911.6 KB · Views: 39
Also today, we made a sub-base which has a nice access port so
the mech can be dropped out if needed. I installed foam to
insulate the mech so she runs real quite.
 

Attachments

  • Factory 2a.jpg
    Factory 2a.jpg
    685.1 KB · Views: 40
  • Factory 2b.jpg
    Factory 2b.jpg
    776.6 KB · Views: 38


Day 2.

Quite a bit happened today.
I hacked, scrapped, and chopped on the base and got it into primer.
Those concrete fences had to go, and the cobblestones too.
I also got a servo installed which will cause the cars to dump into the bin.
 

Attachments

  • Factory 3b.jpg
    Factory 3b.jpg
    652.5 KB · Views: 34
Day 3.

The brick building's front facade gets window openings and a patch.
After it was made to fit, that is. Man, it was close - had to scrape plastic
to get enough clearance. Luckily, this servo runs quite.

Suddenly, the brick building looks "feasible".
 

Attachments

  • Factory 3c.jpg
    Factory 3c.jpg
    385.1 KB · Views: 38
  • Factory 4a.jpg
    Factory 4a.jpg
    398.3 KB · Views: 35
Day 4.

Today we installed 4 leds that will light the interiors of the buildings, and the area
below the big building where the "target" car sits.

Finished closing up a hole in the big building's base, and gave it some rail
sections and uprights for support.

Suddenly, the large building looks more "feasible" too.
 

Attachments

  • Factory 4b.jpg
    Factory 4b.jpg
    364.6 KB · Views: 37
Day 5.

Almost finished the base today. Just that patched area to finish and a little paint.
Extended the sub-base enough to install the concrete bridge and pillar.
The model was missing the smoke stack, so I made one.
Got the windows made, except for the exterior trim.
I started work on new stove pipes for the buildings.
Each building had two, but I want just one pipe per building - I will
close up the extra holes with bondo...

Getting stoked now, she is starting to come together!
 

Attachments

  • Factory 5a.jpg
    Factory 5a.jpg
    596.7 KB · Views: 34
Day 6 & 7.

Yep, it took 2 days to finish the base and build all the railings.

Note how the railing is made in place. In the pic you can see how things go.
BTW, I use finger nail clippers on those posts - after all the soldering is done.
Much faster, more accurate, and does not stress the joint.
 

Attachments

  • Factory 6a.jpg
    Factory 6a.jpg
    522 KB · Views: 40
Day 8 & 9.

Finished up the brick building, installed the smoke stack, and installed
HO C100 rail supports above the bin.
So it was a good day...
Then crap, I lost one days pics.
They were of the lighting build and install...
 

Attachments

  • Factory 7a.jpg
    Factory 7a.jpg
    494.6 KB · Views: 40
Day 10.

Some final painting and weathering to cover my patches...

More picture taking, and editing...

Now finished, she will be listed on feebay starting at $150.

Have a look at the awesome lighting I laid on this bad boy.
11 lights in all.
 

Attachments

  • Factory 9a.jpg
    Factory 9a.jpg
    220.6 KB · Views: 33
  • Factory 9b.jpg
    Factory 9b.jpg
    334.5 KB · Views: 41
  • Factory 9c.jpg
    Factory 9c.jpg
    784.7 KB · Views: 39
  • Factory 9d.jpg
    Factory 9d.jpg
    769 KB · Views: 45
  • Factory 9e.jpg
    Factory 9e.jpg
    695.5 KB · Views: 38
  • Factory 9f.jpg
    Factory 9f.jpg
    759.3 KB · Views: 39
  • Factory 9g.jpg
    Factory 9g.jpg
    641 KB · Views: 44
  • Factory 9h.jpg
    Factory 9h.jpg
    800 KB · Views: 38
  • Factory 9i.jpg
    Factory 9i.jpg
    676.9 KB · Views: 39
  • Factpry 9j.jpg
    Factpry 9j.jpg
    748.4 KB · Views: 40






Affiliate Disclosure: We may receive a commision from some of the links and ads shown on this website (Learn More Here)

Back
Top