Hi Folks, apart from my 0n30 Cooncreek & Tumbleweed Springs, I am in the process of making a 6'x3' N-scale logging layout. This has four levels with a few switchbacks as well.
Here's the plan and a photo of how far along I am.
This is the trestle bridge going up to the top level...