Search results


  1. Larry Creel

    New Train layout 6-1-23

    Started to seperate brass Track for the new tables today. I have a mess of #4 #6 & #8 Turnouts, plus all the 9" straights, curves, rerailers, short pcs. & about 25 pcs. of NS 3ft Flex., & about 35 end of track bumpers & a bunch of crossings I won't be using. After I get all that laid on 2 tables...
  2. Larry Creel

    New Train layout 6-1-23

    Made another Lego Hotel this morning. 11" high & 5" square. Going to call it the Pyramid Hotel. I also moved the other Hotel up on 1 end of the east mountain. Both sets of pictures here. 4-16-24
  3. Larry Creel

    New Train layout 6-1-23

    Found an item at Dollar Tree yesterday that would be a great item for structures, bridge supports & a hundred other ideas. A box of 72 wood blocks. 1&7/8ths long, 5/8ths wide are most some are narrower & 1/2" thick. Beautiful colors. $1.25 per box. I bought 3 boxes. They are on the bottom shelf...
  4. Larry Creel

    New Train layout 6-1-23

    All new tables are done & painted as of today. 4-14-24. Installed my transformers & sound systems on the end of the west side table & all the wiring is in & I can now run trains. All the turnout switches are hooked up & marked on the front Facia Boards. The only thing that I have to hook up now...
  5. Larry Creel

    New Train layout 6-1-23

    Finished up the table on the other end this afternoon. 85" long & 36" wide by 70" high. Going to put all my Transformers & sound Systems on the end of this table in the isle. I also made the center isle 36" wide in case I want to add a let down bridge between the 2 tables later. 4-2-24
  6. Larry Creel

    New Train layout 6-1-23

    Went to Home Depot today & bought enough lumber to add onto my layout in the middle. This Table is 36" wide & 80" long & the same height as the layout is now. This one is on the east end of the layout. Cut the Facia out 3ft wide before I got started. Work on the other end tomorrow if I can get...
  7. Larry Creel

    New Train layout 6-1-23

    New Sanding Rack I made this morning. 3-2-24
  8. Larry Creel

    New Train layout 6-1-23

    Castle on a Hill. Micro Mini Lego. 11 by 31 inches. 3-29-24
  9. Larry Creel

    New Train layout 6-1-23

    Been working 4 days hooking up turnout switches & cutting track for 18 blocks in front of & beside the engine shed. Then I hooked up 4 turnout switches & blocks for the passenger station & 8 more for other blocks. Takes a long time when you work by yourself.
  10. Larry Creel

    Jeffrey Wimberly's final resting place.

    Who's running his group Now?
  11. Larry Creel

    New Train layout 6-1-23

    Started making a Fueling rack for engines this week too. Still need to make an overhead sanding rack w/downspouts. Then will have to buy some small rubber rope to use for hoses at each pump. What do you all think?
  12. Larry Creel

    New Train layout 6-1-23

    I redid all the tops of the service racks this week to make them look like metal tops. I used plastic canvas & it made a 100% different look. Did the ones in the engine shed & the ones outside the shed too.
  13. Larry Creel

    Jeffrey Wimberly's final resting place.

    I didn't know he passed away. When did that happen? I use to talk to him on the phone at least once a month back in the 80's & 90's.
  14. Larry Creel

    New Train layout 6-1-23

    Made engine work stations inside the Engine Shed today. All Lego items & I also added some trim to the front of the roof on the engine shed. There was a 3/8ths opening on the front & about 6" on the sides. I used some wood dowels to fill in that space & glued it all w/E6000 glue. Tomorrow I hope...
  15. Larry Creel

    New Train layout 6-1-23

    This Lego's Build I had to do right on the layout to get everything lined up next to the original Train Shed. Took me about 3 hrs & then I added the 1\16" Peel & Stick foam sheet to the roof panel which I will paint flat black later. The building is 10 by 10 inches & 4 & 1/2" tall. I never glue...
  16. Larry Creel

    New Train layout 6-1-23

    Then I built a 4 pc. Miniature castle out of lego's that I'm going to add to the side of 1 of my mountains. This one took me 3 days to build. These are called Micro Mini Blocks & were very hard for me to hook together w/pains in my hands.
  17. Larry Creel

    New Train layout 6-1-23

    Here it is March already. had the Flu for about 2 weeks & couldn't work on the layout & then I passed out in the bathroom from not eating hardly anything for 2 weeks, so, now I'm back to building Trains & layout stuff again. I finally got the roof almost finished for the Train Shed & now it...
  18. Larry Creel

    New Train layout 6-1-23

    On my last Layout in Arcadia,Fl. before I moved up here I used Pink & Green Foam insulation on 1 of the 20ft long tables & framed up a long mountain on a 16ft long table & added the small chicken wire & covered it with Drywall Mud & on another table that was 20ft long I used Expansion Foam(16...
  19. Larry Creel

    New Train layout 6-1-23

    I guess you noticed I'm still using Lego's for all of my structures. I'm also getting ready to add 2 more tables to the inside of the layout for Yards & then I will move all of my Transformers & sound systems & other stuff to the end of the table thats closest to what I have now. Today I'm going...
  20. Larry Creel

    New Train layout 6-1-23

    I can only attach 10 files at a time, so, here's 10 more.



Back
Top